Migration identity#
- Canonical identifier:
S08.1(GitHub issue type: subtask). - Legacy identifier:
C08.1(retained asold_identifier). - Parent epic:
E08. - Milestone:
M1 — IntentGuard Weekend MVP.
Objective#
Explain the problem, architecture, measured comparison, confidence/abstention behavior, quick start, demo, repository map, and honest status concisely.
Rationale#
A reviewer needs a high-signal entry point that reflects real evidence and points to deeper authority.
Parent identifier#
E08.
Source task#
T-008.
Traceability#
Primary: T-008. Secondary: FR-010, NFR-010, AC-013, AC-014.
Prerequisites#
Final U03/U05/U06/U07 evidence and stable commands.
Likely files#
README.md, links to docs/OPERATIONS.md, docs/IMPLEMENTATION_STATUS.md, docs/LIMITATIONS.md, specification and reports.
Implementation boundary#
Concise landing page sourced from real outputs and authoritative documents; no complete specification copy.
MUST scope#
Objective, normalized lifecycle, architecture boundary, measured metrics, selective prediction, real demo, commands, status, limitations, license/data-model attribution.
Explicit non-goals#
Marketing exaggeration, optional roadmap detail, hand-maintained metric duplication, fake screenshots, or deployment guide.
Acceptance criteria#
A reviewer locates setup/demo/evidence/status within five minutes; commands are executable; metrics link to source reports; strict/degraded states are unmistakable.
Validation commands#
uv run python scripts/validate_foundation.py && make demo.
Expected evidence#
Valid links, command/output consistency, report-sourced metric presentation, and reviewer walkthrough notes.
Fallback and status consequence#
Unavailable evidence stays labelled unavailable; stale or unsupported claims make U08 Partial and strict MVP fails.
Stop condition#
Stop for metric drift, broken links, copied specification, mock demo, or contradictions with implementation status.
Definition of ready#
Final evidence paths and statuses are fixed.
Definition of done#
README is concise, accurate, reproducible, and consistent with the acceptance verdict.
Labels#
type:subtask, priority:MUST, area:documentation
Estimate#
0.5 hour.