IntentGuard

E08 — Documentation and recruiter-ready delivery

Planning / historicalumbrelladelivery

Historical

Planning material. It summarizes and links to the authoritative specification and the current measured state — it does not replace either, and it is not current engineering truth.

Migration identity#

  • Canonical identifier: E08 (GitHub issue type: epic).
  • Legacy identifier: U08 (retained as old_identifier).
  • Parent umbrella: W03.
  • Milestone: M1 — IntentGuard Weekend MVP.

Objective#

Publish concise documentation that lets a reviewer understand, reproduce, operate, verify, and demonstrate exactly what IntentGuard implements and measures.

Rationale#

The portfolio value depends on clarity and honesty as much as code: results, constraints, fallbacks, and operating steps must agree with executed evidence.

Parent identifier#

Umbrella issue W03 in milestone M1 — IntentGuard Weekend MVP.

Source task#

T-008.

Traceability#

Primary: T-008, NFR-010. Secondary documentation supports AC-013 and AC-014 without owning them.

Prerequisites#

U01–U07 outputs, final artifact/report identifiers, and actual validation results.

Likely files#

README.md, docs/OPERATIONS.md, docs/IMPLEMENTATION_STATUS.md, docs/LIMITATIONS.md, demonstration documentation, and links to generated reports.

Implementation boundary#

Summarize and link to the authoritative specification and real outputs. Do not copy the complete specification or hand-edit metric values independently of reports.

MUST scope#

S08.1 recruiter-facing README; S08.2 operations/status/limitations; S08.3 five-minute delivery path and final consistency review.

Explicit non-goals#

Marketing claims beyond evidence, optional deployment tutorials, duplicate design documents, speculative charts, or screenshots from mocked behavior.

Acceptance criteria#

A new reviewer can install, run commands, locate evidence, understand the threshold lifecycle and API, reproduce the real demo, distinguish implemented/planned/degraded work, and see explicit limitations within five minutes.

Validation commands#

uv run python scripts/validate_foundation.py && uv run python scripts/validate_acceptance.py && make demo.

Expected evidence#

Valid local links, command examples matching the Makefile, metrics sourced from reports, implementation-status table matching acceptance evidence, limitations, and a real-artifact demo script/transcript.

Fallback and status consequence#

If metrics or demo evidence are unavailable, document them as unavailable; do not substitute invented or mocked results. Missing required documentation makes U08 Partial and strict MVP fails.

Stop condition#

Stop for copied specification drift, stale commands, unsupported claims, fake evidence, broken links, or contradictions with the status/acceptance report.

Definition of ready#

U07 evidence is stable and every published claim has a declared source.

Definition of done#

S08.1–S08.3 pass, documentation is internally consistent and concise, and the repository is ready for an honest recruiter review.

Labels#

type:epic, priority:MUST, area:documentation

Estimate#

1.5 hours.

Related in repository

Open in full graph →
DOCUMENTED_BY — source: docs/backlog/umbrellas/U08-documentation-delivery.md § E08 — Documentation and recruiter-ready deliveryREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.mdREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.mdREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.mdREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.mdREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.mdREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.mdREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.mdREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.mdREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.mdPART_OF — source: docs/backlog/TRACEABILITY.md § Source tasksPART_OF — source: docs/backlog/TRACEABILITY.md § Non-functional requirementsPART_OF — source: docs/backlog/tasks/C08.3-five-minute-delivery.md § Migration identityREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.md § TraceabilityREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.md § TraceabilityREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.md § TraceabilityREFERENCES — source: docs/backlog/umbrellas/U08-documentation-delivery.md § TraceabilityREFERENCES — source: docs/backlog/tasks/C08.1-recruiter-readme.md § TraceabilityREFERENCES — source: docs/backlog/tasks/C08.3-five-minute-delivery.md § TraceabilitySATISFIES — source: docs/specification/docs/TRACEABILITY.md § Non-functional traceabilityREFERENCES — source: docs/backlog/tasks/C08.1-recruiter-readme.md § TraceabilityREFERENCES — source: docs/backlog/tasks/C08.2-operations-status-limitations.md § TraceabilityREFERENCES — source: docs/backlog/tasks/C08.3-five-minute-delivery.md § TraceabilityPART_OF — source: docs/backlog/TRACEABILITY.md § Non-functional requirementsREFERENCES — source: docs/backlog/tasks/C08.1-recruiter-readme.md § TraceabilityREFERENCES — source: docs/backlog/tasks/C08.2-operations-status-limitations.md § TraceabilityREFERENCES — source: docs/backlog/tasks/C08.3-five-minute-delivery.md § TraceabilityPART_OF — source: docs/backlog/TRACEABILITY.md § Source tasksREFERENCES — source: docs/backlog/tasks/C08.1-recruiter-readme.md § TraceabilityCURRENTdocument: E08 — Documentation and recruiter-ready deliveryE08epic: E08AC-013 — Local demonstra…acceptance-criterion: AC-013 — Local demonstrationAC-014 — Validation gateacceptance-criterion: AC-014 — Validation gateNFR-010 — Honest reportingrequirement: NFR-010 — Honest reportingS08.1task: S08.1S08.2task: S08.2S08.3 — Validate the fiv…task: S08.3 — Validate the five-minute delivery pathT-008 — Honest recruiter…task: T-008 — Honest recruiter-ready delivery bundleU01 — Project foundation…capability: U01 — Project foundation and reproducibility
Hover an edge for its provenance · click a node to open it10 nodes · 29 edges